The procedure to create a new disturbance location prioritisation factor is as follows:
- Navigate to Quick Menu > Asbestos > Configuration > Configure Priority. The Configure Priority window is displayed.
- Click on New Disturbance Location. The Add Disturbance Location window is displayed.
- Enter a Description for the new disturbance location prioritisation factor into the field provided e.g. Loft space, Boiler room, etc.
1.
- Use the Score field to assign a risk assessment weighting to the disturbance location prioritisation factor. The Up and Down arrows are available to increment or decrement the value, as required.
- Use the Code field to abbreviate the disturbance location prioritisation factor, as a prerequisite for customised reporting layouts.
- Using the Companies drop-down field, multi-select all companies relevant to the operating boundaries of this disturbance location prioritisation factor, or choose the All option, as required
1.
- Choose an Effective from date for this disturbance location prioritisation factor i.e. the date on which it came into effect
2.
- Choose an Effective to date if the parameter is to be time bound; a blank field means the disturbance location prioritisation factor will be continually valid.
- Click on Save. The new parameter entry appears in the Disturbance Location grid
3.
Tip
1 Where only a small number of parameter values are not required, activate the All tick box first and then deselect individual items from the full list, as appropriate; the All tick box will be automatically removed once an item is deselected.
Note
1 System validation rules ensure that the description entered for each disturbance location prioritisation factor is unique for the selected company within the effective period.
2 The Effective from date defaults to the current system date and cannot be left blank.
3 The list position of the parameter is governed by the incrementally assigned Value.
See related topics...
Priority scoring maintenance overview