The procedure to create a new planned programme template is as follows:
- Navigate to Quick Menu > Planned & Servicing Lite > Configuration > Planned Program Template. The Planned Program Template Management window is displayed.
- Click on New Template
1. All fields are activated ready for data entry.
- Enter a Template name for the planned works instruction into the field provided
2.
- Using the SOR table drop-down field, select an appropriate Schedule of Rates table containing all work instructions relevant to a planned programme.
- Using the Update rule drop-down field, select the rule that will be applied to the underlying asset management configuration database on completion of the resulting works orders.
- Using the Component drop-down field, select a parameter value to capture the stock condition focus area to which the SOR template relates.
- Using the Repair drop-down field, select the specific repair element based on the chosen component.
- Using the Apply to drop-down field, multi-select all repair types that are relevant to the planned works instruction, or choose the All option, as required
3
1.
- Choose an Effective from date for this planned programme SOR template i.e. the date on which it came into effect
4.
- Choose an Effective to date if the SOR template content is to be reviewed on a specific date or to capture a change of circumstances; a blank field means the template will be continually valid.
- Click on Save.
Tip
1 Where only a small number of parameter values are not required, activate the All tick box first and then deselect individual items from the full list, as appropriate; the All tick box will be automatically removed once an item is deselected.
Note
1 Upon first access, all fields are automatically activated ready for data entry; hence the New Template button is inactive.
2 System validation rules ensure that the name entered for each new SOR template is unique for the effective period.
3 All reactive repair types are available for selection, ensuring that comprehensive asset management information is maintained.
4 The Effective from date defaults to the current system date and cannot be left blank.