The procedure to view the calculated service charges for asset records is as follows:
1.
2. The proposed service charge values are displayed in the Asset Results summary table, specific to the calculation type in operation
1. Certain fields are worthy of special note and are captured in the table below
3.
Tip
1 By default, all results are displayed alphabetically, by 'asset address'; to aid in identification and analysis, rows can be reordered by clicking on any of the available headings.
Note
1 The Search Calculations field will match against any element of the calculation scenario description.
2 For Import and Manual calculation methods, only the selection of a Rent charge type is applicable.
3 A subset of fields are visible by default; additional fields pertinent to the calculation type can be revealed or hidden via the Menu option.
Field |
Description |
Calculation Type |
Asset |
The address of the asset included in the calculation scenario. |
All calculation types |
Base total charge |
The current charge for the asset record, including any brought forward balance from the previous period. |
Estimate or Adjustment |
Proposed basic charge |
The proposed estimated or adjusted charge for this period (excluding any brought forward balance), derived through the calculation scenario. |
Estimate or Adjustment |
Proposed B/F balancing charge |
The proposed surplus or deficit balance brought forward from the previous period. |
All calculation types |
Proposed total charge |
The summation of the Proposed basic charge and Proposed B/F balancing charge figures used to calculate the estimated or adjusted results for this period. |
Estimate or Adjustment |
% Increase |
The percentage by which the current total charge has increased as a result of the calculation. |
Estimate or Adjustment |
Estimated charge |
The baseline projection figure used to calculate the final result. |
Actual |
Total estimated charge |
The summation of the B/F balancing charge and Estimated charge figures used to calculate the final result. |
Actual |
Proposed actual charge |
The projected final charge, derived through the calculation scenario, excluding any balance brought forward from the previous period. |
Actual |
Proposed total actual charge |
The projected final charge, derived through the calculation scenario, including any balance brought forward from the previous period. |
Actual |
Balancing charge to C/F |
The final combined charge to be carried forward into a future scenario, applicable only in the instance where an estimated calculation is used as a baseline projection. |
Actual |
See related topics...
Service charge results management overview
To cascade calculated service charge cost elements to asset records
To modify the calculated service charge cost elements of an asset record