To export a planned works inspection summary to MS Excel

Parent Previous Next

The procedure to export a planned works inspection summary to MS Excel is as follows:

  1. Prerequisite procedural steps are covered separately in the topic To create bulk inspections for a planned works programme. Refer to these before proceeding to step 2.
  2. With the Create Inspection Completed window displayed, click on Export To Excel. The export report is compiled in MS Excel format and assigned the default file name CreateInspectionResult 1.
  3. Click on Save to store the file in the default Windows Downloads folder; click on Save As to choose an alternative location. The content of the file is summarised in the table below.


Note

1 Where a file of the same name already exists in the destination folder, the new export report will be annotated with an incremental suffix counter.


Field

Description

Planned Program Asset

The full address of each asset included in the inspection creation process.

Inspection Reference

The system-generated unique reference number assigned to each individual asset works inspection.

Error

The root cause of any failure encountered during the creation of each individual asset works inspection.