<This topic is in draft form only - it has been constructed solely from the corresponding requirements documentation and supporting use cases>
The procedure to add a new PSL rate element to an asset is as follows:
1.
).
2. The Rates tab is activated, revealing a list of all consolidated lease fees applicable to the asset in the PSL Rates summary table.
3.
), or type in the value directly (format DD/MM/YY or DD/MM/YYYY) i.e. the date on which a review of the rate element fee was last conducted.
), or type in the value directly (format DD/MM/YY or DD/MM/YYYY) i.e. the date on which the next review is scheduled for this rate element.
4. The new record is displayed in the Rate Elements summary table.
5. The Total Base Value and Total Actual Value fields reflect the additional rate element component.
Note
1 The search facility will return all possible matches for any corresponding address field once the Number of characters before an automatic search commences system preference is reached.
2 This option is only available for assets that have been configured with a PSL ownership category.
3 Where the value of the selected PSL rate element is a fixed price, this will be displayed for verification purposes only and cannot be adjusted.
4 The Updated By and Updated Date fields are automatically populated with the name of the end user adding the rate element and current system date respectively.
5 To amend the details of an existing asset rate element, double-click on the desired row in the Rate Elements summary table and repeat steps 11 through 15; only a limited number of fields can be updated once a record has been created.
See related topics...
PSL rate setting management overview
To create a new PSL rate for an asset
To clone a PSL rate for an asset